Sol GreenWay Solar Path Lighting User Manual

Browse online or download User Manual for Lighting Sol GreenWay Solar Path Lighting. Sol GreenWay Solar Path Lighting User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - GreenWay®

GreenWay® Solar LED Path and Trail Lighting SystemInstallation and Owner’s Manual

Page 2 - Important Notes and Warnings

10 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System2.8 Attaching Battery Box to the Solar Panel M

Page 3 - 1.0 System Overview

11 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System4 x 1/4”–20 x 1/2” hex head boltsbBattery Encl

Page 4 - 1.0 Positioning the Light

12 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System2.9 Attaching the Controller to Battery Box Cov

Page 5 - 2.0 Assembling

13 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System2.10 Attaching the LED Fixture to the ArmAtt

Page 6 - 6 MKTG-IM-GWY-03-EN-0513

14 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting SystemLED Fixture PrecautionsThe Ascot and Shoebox fixt

Page 7 - 7 MKTG-IM-GWY-03-EN-0513

15 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System2.12 Connect the CablesBatteries (1 or 2)Gre

Page 8 - Arm Assembly

16 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System2.10 Test2.11 Close Battery Enclosure Covera

Page 9 - 9 MKTG-IM-GWY-03-EN-0513

17 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System3.0 Operation and Maintenance3.1 Expected Pe

Page 10 - Double Battery Box:

18 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting SystemFuse ReplacementIf the fuse needs to be replaced

Page 11 - @.87” Dia

19 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System3.3 Troubleshooting ChartProblem Possible Cau

Page 12 - Mounting Studs

2 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting SystemImportant Notes and WarningsThis installation and

Page 13 - Set Screws

Sol Inc. | 3210 SW 42nd Avenue | Palm City, Florida 34990www.solarlighting.comE-mail support: [email protected] Phone: +1.772.286.9461 |

Page 14 - If using Deka

3 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System1.0 System OverviewFIGURE 1: Sol Greenway Sy

Page 15 - 2.12 Connect the Cables

4 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System1.0 Positioning the Light

Page 16 - 2.10 Test

5 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System2.2 Routing the Load Cable Through the Arm As

Page 17 - 3.1 Expected Performance

6 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System2.3 Drilling Holes in the Solar Panel Mount1. D

Page 18 - 18 MKTG-IM-GWY-03-EN-0513

7 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System2.5 Assembling the ComponentsPlacing the Arm

Page 19 - 3.3 Troubleshooting Chart

8 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System2.6 Positioning the Arm Assembly and PV Mount As

Page 20

9 MKTG-IM-GWY-03-EN-0513Installation Manual | Greenway® Solar LED Path and Trail Lighting System2.7 Riveting the Arm Assembly and PV Assembly

Comments to this Manuals

No comments